Detailed Engineering Design Services for EPCIC of PM309 Gas Ledang Segment 2 Development Project

Client

PCG.png

Contractor

UMD-logo-white-bg_edited_edited.jpg

Duration

June 2020
-
October 2021

PM 309 Ledang gas facilities is located offshore Terengganu. The Ledang Phase 2 development installed new facilities that includes :

  • 1 x subsea tree and wellhead

  • 1 x 2.3km Flowline and umbilical from Ledang to LDP-A

  • Host Tie-In and Modification at LDP-A.

The detailed engineering scope includes:

  • Subsea Christmas Tree, Wellhead, flow base and tooling

  • All subsea tree and tubing hanger tooling, IWOCS (including hydraulic fluids and other consumables) and ROV/Diver tooling for subsea tree installation 

  • Procedures for simultaneous operations (SIMOP) activities