Detailed Engineering Design Services for EPC of CPSF New Flare System at Turkmenistan
Client

Contractor

Duration
October 2023
-
June 2024
Central Processing and Storage Facility (CPSF) handles production from LAM and ZHD fields
Capacity: 100,000 bpd oil, 25,000 bpd water, 200 MMSCFD gas
The existing Plant Flare System handles 220 MMSCFD flare gas, utilities, and facilities. To improve the flare system Dragon Oil installed a new gas flaring system with additional 220 MMSCFD capacity.
To integrate the flare system DAR was commissioned to undertake engineering work that includes:
-
Tie-in new flare header near existing system
-
Retrofit existing flare system and components
-
Install new equipment (flare gas Knockout drum, Main Knockout Drum, Fuel gas knockout drum, Pump System, Purging Gas System, Flare stack & Tip, Automatic HE spark pilot ignition system, Flame front ignition unit, Ultrasonic Flow Meter, PCS & ESD/FGS system extension, F&G detection and monitoring)
-
Install associated firefighting, piping, valves, control system, safety systems