top of page
Detailed Engineering Design Services for EPCC+T&I of South Furious-30 (SF30) Development Project
Client

Contractor

Duration
January
-
December 2023
SFJT-D is in South Furious 30 located offshore Sabah, near Labuan
SFJT-D Platform has following facilities:
-
4-legged Mini CPP platform connected to SFJT-C via bridge
-
5 Oil Producer wells, 6 Water Injector wells
-
All well has gas lift flowline supplied from SFJT-C
-
Oil Processing Facilities
-
Future connection to water injection MOPU
-
Engineering Scope in the development project includes:
-
Topside with new drilling deck extension (refurbishment of Tanjong Baram Topside)
-
Main Support Frame (MSF) with cantilevered bridge to SFJT-C and vent boom.
-
New 4-legged substructure
Engineering Consultancy: Key Highlights Projects
bottom of page