Detailed Engineering Design Services for Module-9 and Pipeline of Bekok Oil Integrated project
Client

Contractor

Duration
November 2022
-
February 2023
The project is for the development of new Compression Module located on Tiong A CPP.
The project main SOW includes:
-
A
-
B
-
C
The main facilities and equipment on compressor module includes:
-
Slug Catcher (V-2010)
-
Booster Compressor Suction Scrubber (V-2410 A/B)
-
Booster Compressor (K-2420A/B)
-
Compressor After Cooler (E- 2430A/B)
-
Lube Oil Cooler (E-2450A/B)
-
HVAC System
-
Fuel Gas Package (A-6010)
-
Compressor Control Room Equipment
-
Exhaust Stack