top of page

Detailed Engineering Design Services for Module-9 and Pipeline of Bekok Oil Integrated project

Client

PCG.png

Contractor

Muhibbah-Logo-3.png

Duration

November 2022
-
February 2023

The project is for the development of new Compression Module located on Tiong A CPP.

The project main SOW includes:

  • A

  • B

  • C

The main facilities and equipment on compressor module includes:

  • Slug Catcher (V-2010)

  • Booster Compressor Suction Scrubber (V-2410 A/B)

  • Booster Compressor (K-2420A/B)

  • Compressor After Cooler (E- 2430A/B)

  • Lube Oil Cooler (E-2450A/B)

  • HVAC System

  • Fuel Gas Package (A-6010)

  • Compressor Control Room Equipment

  • Exhaust Stack                                 

bottom of page