Client

Contractor

Duration
August 2022
-
February 2024
Central Processing and Storage Facility (CPSF) handles production from LAM and ZHD fields
Capacity: 100,000 bpd oil, 25,000 bpd water, 200 MMSCFD gas
The debottlenecking study and capacity upgrade studied issues in liquid & vapor streams and to upgrade for future production and increased water handling
Scope of Work (SOW):
-
Reroute liquid outlet from slug catcher
-
Retrofit LP three-phase separator
-
Install new equipment (Water Bath Heaters, Oil/Water Transfer Pumps, De-sander Cyclones, Gas Scrubber, Flow Transmitters/Control, Substation Building, Battery Room, FACP, UPS, Instrument Air Package)
-
Expand control & monitoring systems
-
Upgrade firefighting and F&G detection/protection systems
-
Install associated piping, valves, control systems, safety systems, fittings, strainers, sample points, analyzers