Conceptual, FEED and DED for 3 Water Injection Wellhead Towers & Associated Pipelines and Installation of New Module at LAM 28 for Water Injection Facilities
Client

Contractor

Duration
May - October 2018
(Conceptual & FEED)
May 2019 - March 2021
(Detailed Engineering)
Duration
DAR Energy completed conceptual design, FEED and detailed design for 3 numbers water injection wellhead towers in Lam-West area in Turkmenistan Caspian Sea, 600 km from Ashgabat.
The new platform is unmanned Light Weight Structure (LWS) with minimum facilities:
-
Design capacity of 40,000 bwpd water injection
-
Design life 25 years
-
Tripod jacket with main deck and cellar deck
-
Wind turbine and solar hybrid power generator.
-
Each platform connected with 8 in pipeline to water injection manifold at Lam 28 for treated water intake.