Conceptual and FEED for 6 Minimum Facilities Platforms for Appraisal Wells & Associated Pipelines

Client

1718254719146_e=2147483647&v=beta&t=qSDgxe9B56Ke-45Reez1nDxiBcc8z7FPuweOaj40GQc.jpg

Contractor

_yMGbJj1wVFmN9_kysUAnAH2Ly22MF659GRfLRvJfsBbfl-6IZmCREqeb4i2aS2HmRziz0RDOPwJ6CDSWKGFbg7aIK

Duration

June 2018
-
February 2019

DAR Energy completed conceptual design & FEED for 6 minimum facilities platform in Turkmenistan as part of EPCIC bid. The facilities were completed on fast-track for drilling two single completion appraisal wells (by jack up rig) to enhance the crude oil production.

The new platform is unmanned Light Weight Structure (LWS) with minimum facilities:

  • Design capacity of 10,000bpd crude with 20mmscfd of gas

  • 2 producer wells per platform

  • Space for 4 future slot of single completion wells

  • Provision of future Multi flow Meter, helideck and H2S Scavenger injection facilities

  • Wind turbine and solar hybrid power generator.

  • Multiphase flow from new oil producing wells are routed to the existing gathering network with new 10” subsea pipeline.