Conceptual and FEED for 6 Minimum Facilities Platforms for Appraisal Wells & Associated Pipelines
Client

Contractor

Duration
June 2018
-
February 2019
DAR Energy completed conceptual design & FEED for 6 minimum facilities platform in Turkmenistan as part of EPCIC bid. The facilities were completed on fast-track for drilling two single completion appraisal wells (by jack up rig) to enhance the crude oil production.
The new platform is unmanned Light Weight Structure (LWS) with minimum facilities:
-
Design capacity of 10,000bpd crude with 20mmscfd of gas
-
2 producer wells per platform
-
Space for 4 future slot of single completion wells
-
Provision of future Multi flow Meter, helideck and H2S Scavenger injection facilities
-
Wind turbine and solar hybrid power generator.
-
Multiphase flow from new oil producing wells are routed to the existing gathering network with new 10” subsea pipeline.